2003 Combined North & West MetroLink
Expansion route
2000 MTIA Preferred Alternatives
combined for possible MetroLink Line
Alternative follows:
The project would extend north from
a connection with existing MetroLink
in the St. Louis CBD to the vicinity
of Natural Bridge Road and Riverview
Blvd. in north St. Louis County. The
route will then split, with a north
branch extending to the Northland Shopping
Area on West Florissant Ave. and a
west branch extending to the WestPort
Area at Page Ave. and I-270.

Congress authorized $275 million for
the project in the reauthorization
of the transportation bill, SAFETEA.
.
In 2000, East-WEst Gateway identified
locally preferred alternatives in the
North, South
and Daniel Boone
study areas as a part of the federally
funded Major Transportation Investment
Analysis. MetroLink was the preferred
alternative in each corridor.